Shopfitting Projects
 |
Client: RSPCA - Bearwood |
Location: Birmingham |
|
|
Show time: 3 Weeks |
The largest and longest RSPCA installation
to-date was at the Bearwood branch in Birmingham.
The complete shopfit included first clearing the
existing site then installing stud work and
slatwall. We also installed the flooring, ceiling,
electrics, external signage, stair rails, counter
area and sorting room.
|
 |
 |
Client: Lawsons - Redhill |
Location: Redhill |
|
|
Show time: 1 Day |
We have recently manufactured and installed
another counter for Lawsons, this time at their
branch in Redhill, Surrey. The counters consist of
standard till and low glazed
showcase modules.
|
 |
 |
Client: SAVS - Southend |
Location: Southend |
|
|
Show time: 1 Week |
During March we won the contract to refit a store
for The Southend Association of Voluntary
Services. The shop area was fitted with a maple
and slatwall theme with matching shopfittings, a
new sales counter and a changing room. We also
installed into the back room, office area and
canteen, giving a complete makeover of the retail
store.
|
 |
 |
Client: Reading FC -
Madjeski Stadium |
Location: Reading |
|
|
Show time: 1 Week |
After having completed several shopfits for
Norwich FC and Bolton FC we now have finished a
shopfit for Reading FC in thier Club shop at the
Madjeski Stadium. We installed 50 sheets of white
slatwall, a new sales counter, shirt display
shelves a window plinth and 32 "H"
style display gondolas.
|
 |
 |
Client: ECig Wizard-
Peterborough |
Location: Peterborough |
|
|
Show time: 2 Days |
At the beginning of December we completed a
shopfit in Peterborough for EcigWizard, an
electronic cigarette retailer. The striking blue
and black colour scheme gives a modern and
contemporary feel. We manufactured, supplied and
installed a counter with LED lighting, display
tables, pedestals and a tv enclosure.
|
 |
 |
Client: Scope -
Letchworth |
Location: Letchworth |
|
|
Show time: 5 Days |
Our second shopfit for the charity Scope was at
thier Letchworth branch. The complete shopfit
included electrics, ceiling and a full decoration.
|
 |
 |
Client: Whipsnade Zoo |
Location: Dunstable |
|
|
Show time: 1 Day |
During October we supplied and installed 3 gift
display units at Whipsnade Zoo. The units are to
be used in their shop and manufactured from Oak
MDMDF with glass shelves.
|
 |
 |
Client: Scope - Newmarket |
Location: Newmarket |
|
|
Show time: 5 Days |
Our first shopfit for the charity Scope was at
thier Newmarket store.
|
 |
 |
Client: Hayes Garden
World |
Location: Ambleside |
|
|
Show time: 1 Day |
We recently manufactured and installed the
Christmas display in the retail section of Hayes
Garden World. This consisted of a Victorian bay
window and house front, decorated to fit in with
the theme of Xmas.
|
 |
 |
Client: Charity Retail
Show |
Location: Keele |
|
|
Show time: 2 Days |
We are proud to have completed shopfits for
RSPCA, British Heart Foundation, Oxfam and similar
charity organisations throughout the UK. If you
are a charity and have any shopfitting
requirements from supply to installation please
get in contact with us on 01487 812822
|
 |
 |
Client: RSPCA - Wimbledon |
Location: Wimbledon |
|
|
Fitting time: 3 Days |
Our 5th shopfit for RSPCA was at the
Wimbledon branch. This time they were looking for
a more "boutique" look and feel, so we used a
walnut and gloss finish for the shopfit and
displays.
|
 |
 |
Client: New Era -
Stratford City |
Location: Stratford |
|
Premises: Apparel
Store |
Fitting time: 3 Weeks |
June saw us complete the shopfit of the newest
and largest New Era store to open in the UK,
situated in the Westfield shopping centre in
Stratford City London. The 2 week long fit
included specialist displays, tables cap stands
and wall displays.
|
 |
 |
Client: E Trade Tech -
Lewisham |
Location: Lewisham |
|
|
Fitting time: 2 Weeks |
During April / May we completed another shopfit
for E Trade Tech , this time in Lewisham Shopping
Centre. The installation included lockable glass
display cabines, slatwall gondolas, shelving,
electrics, decorating, flooring and a bespoke
retail counter.
|
 |
 |
Client: RSPCA -
Northfield |
Location: Northfield |
|
|
Fitting time: 2 Weeks |
Our 4th RSPCA shopfit was for the branch in
Northfield - Birmingham. The 2 week shopfit
included new floors, lighting, white slatwall, new
sales counter, retail displays and company logo
signage. We look forward to working on more
projects with the RSPCA in the near future.
|
 |
 |
Client: Norwich City FC |
Location: Norwich |
|
|
Fitting time: 2 Weeks |
Our 3rd Shopfit for Norwich City Football Club
was in the Chapelfield Mall, Norwich. The complete
shopfit took 2 weeks and included sales counters,
lighting, flooring and display gondolas all
manufactured in the clubs distinctive yellow and
green colour scheme. We would like
to congratulate them on a fantastic
season in the Premier League and look forward
to working with them again very soon.
|
 |
 |
Client: New Era -
Flagship Store |
Location: London |
|
|
Fitting time: 1 Weeks |
One of our long standing customers New Era Caps
approached us to refit thier London flagship store
on Brewer Street. The complete rip out and refit
took 1 week and consisted of new cap displays,
apparel bays, retail display cabinets,
drawers and sales counters.
|
 |
 |
Client: E-Trade Tech -
Camden |
Location: Camden |
|
|
Fitting time: 2 Weeks |
Another project this month saw
us complete a shopfit for E Trade Tech in
Camden London. The install consisted of
slatwall, secure glass cabinets, counter, flooring
and lighting.
|
 |
 |
Client: Van Hage Garden
Centre |
Location: Great Amwell |
|
|
Fitting time: 1 Days |
During March we manufactured 18 greeting card
displays for Van Hage Great Amwell. We also
installed slatwall panels around a existing
section of the store.
|
 |
 |
Client: Simply Run |
Location: Stratford Upon
Avon |
|
|
Fitting time: 5 Days |
At the start of March we undertook a shopfit for
Simply Run at their store in Stratford Upon Avon.
We supplied and installed 45 sheets of maple
slatwall, freestanding merchandise displays, a
foot shape wall display for showcasing trainers,
new carpet, ceiling tiles and decoration.
|
 |
 |
Client: Four Seasons
Garden Centre |
Location: Sleaford |
|
|
Fitting time: 4 Days |
Our most recent completed shopfit was for Four
Seasons Garden Centre in Sleaford. We manufactured
and installed a new canopy for the till and
information area, slatwall around various retail
sections of the store, new gift display units,
wall mounted displays and a selection of display
tables.
|
 |
 |
Client: The Art Trading
Company |
Location: Bungay |
|
|
Fitting time: 2 Days |
The end of November saw us complete a project for
"The Art Trading Company" in Bungay Norfolk. We
designed and manufactured bespoke paper storage
units with cuboards, picture and canvas displays,
retail cabinets and a new counter. Once
manufactured we then installed into thier new
retail shop.
|
 |
 |
Client: New Era- Box Park |
Location: Shoreditch |
|
|
Fitting time: 2 Weeks |
We have just finished a project for New Era at the
soon to open Box Park project in Shoredich,
London, the worlds first pop-up mall. The 40
foot containers were completely fitted out to
create a new kind of retail experience.
www.boxpark.co.uk
|
 |
 |
Client: Van Hage -
Peterborough |
Location: Peterborough |
|
|
Fitting time: 1 Day |
Our first Christmas project of 2011 was for Van
Hage, a local Garden Centre in Peterbrough. We
manufactured an 8 metre long MDF train which
is going to be used to display toys in the
Christmas section of the store.
|
 |
 |
Client: Cash Generator -
Erith |
Location: Erith |
|
|
Fitting time: 2 Weeks |
Our 12th Cash Generator shopfit was in Erith,
Greater London.
|
 |
 |
Client: Cash Generator -
Seven Sisters |
Location: Seven Sisters |
|
|
Fitting time: 2 Weeks |
Our 11th Cash Generator shopfit was in Seven
Sisters London. The 2 week shopfit included the
standard spec cheque and cash counters,
slatwalling, Tego and lockable glass display
cabinets.
|
 |
 |
Client: Musicroom -
Galleria |
Location: Galleria |
|
|
Fitting time: 3 Days |
A second shopfit for Music In Print
during October took place at the Galleria in
Hertfordshire. The empty shell was turned into a
shop using both perimeter and wall mounted
slatwall and a new retail counter.
|
 |
 |
Client: Musicroom - Leeds |
Location: Leeds |
|
|
Fitting time: 3 Days |
Music in Print, a long standing customer
approached us to refit thier musicroom store
in central Leeds. The installation was
predomintaly a slatwall install with over 30
sheets of maple, new flooring and electrical
outlets.
|
 |
 |
Client: Vitas Cricket -
Peterborough |
Location: Peterborough |
|
|
Fitting time: 1 Days |
During September we installed 10 sheets of white
slatwall for a new cricket store opening in
Peterborough. We also manufactured and supplied 2
slatwall "H" Gondolas, 2 Display Tables and
various shopfitting accessories.
|
 |
 |
Client: Mildenhall Auto
Shop - Mildenhall |
Location: Mildenhall |
|
|
Fitting time: 2 Days |
August finished with a 2 day shopfit at a new auto
repair and car modification store on RAF
Mildenhall airbase. The fit out was made to look
like a 1950's retro cafe theme. We installed
several sheets of red slatwall, a new counter and
display cabinets.
|
 |
 |
Client: John Lewis -
Peterborough |
Location: Peterborough |
|
|
Fitting time: 1 Night |
At the start of August we completed an overnight
install at John Lewis in Peterborough. The install
was in the sports section and consisted of a new
custom display wall with fittings and a
mirror.
|
 |
 |
Client: Cash Generators -
Woolwich |
Location: Woolwich |
|
|
Fitting time: 2 Weeks |
Our 10th Cash Generator shopfit was in Woolwich,
East London
|
 |
 |
Client: Cash Generators -
Barkingside |
Location: Barkingside |
|
|
Fitting time: 2 Weeks |
Our 9th Cash Generator shopfit was at a new store
in Barkingside, North East London.
|
 |
 |
Client: Bolton Wanderers
FC |
Location: Bolton |
|
|
Fitting time: 2 Days |
At the start of June we completed two phases of an
install for Bolton Wanderers Football Club. We
installed 20 sheets of white slatwall with
aluminium inserts into the club store to give
it a new clean look.
|
 |
 |
Client: Confident Kids |
Location: Chichester |
|
|
Fitting time: 2 Days |
Another shopfit squeezed in to the end of May saw
us complete a fit at "Confident Kids" toy shop in
Chichester. We supplied and installed 11 gift
display units with LED downlights, a few
sheets of slatwall, a new counter and a
new window display.
|
 |
 |
Client: Guitar Guitar |
Location: Epson |
|
|
Fitting time: 3 Weeks |
One of our larger slatwall installs took place in
Epson Surrey at Guitar Guitars new premises. We
installed over 300 sheets of slatwall onto
studwork and also fitted orange laminated skirting
and pelmets.
|
 |
 |
Client: Cash Generators -
Wallasey |
Location: Wallasey |
|
|
Fitting time: 2 Weeks |
May saw us complete another shopfit for Cash
Generators, this time in thier new look colours
and displays.
|
 |
 |
Client: Garden Pride |
Location: Hassocks |
|
|
Fitting time: 1 Day |
At the beginning of April we manufactured and
installed a greeting card display wall for Garden
Pride Garden Centre.
Our C Wall System, part of the Fast-Wall
range, easy to install and the ideal walling
system for Exhibition Stands, Room Sets,
Partitions or Temporary Wall Installations.
|
 |
 |
Client: KORG - Keyboard
Display Area |
Location: Birmingham |
|
|
Fitting time: 1 Day |
Electronic keyboard manufactuer KORG approached
us and asked us to manufacture a display area to
showcase thier products in the well known music
store Hard to Find Records in Birmingham. We
supplied 6 wall modules with adjustable shelf
brackets, cable management, shelves and large
format graphics and installed in one day.
|
 |
 |
Client: Cash Generator -
Wavertree |
Location: Wavertree |
|
|
Fitting time: 8 Days |
This month we completed a shopfit for Cash
Generator in Wavertree. Their new look features
pewter slatwall built around the standard Buying
and Cheque counters and encorporates LED lighting.
We also installed HDMI test bays alongside all the
usual Cash Generator components, including Tego,
glass displays and security doors.
|
 |
 |
Client: R&M Carpets |
Location: St.Ives |
|
|
Fitting time: Ex Works |
We recently supplied 10 of our gift display units
with lights to a local compay who are opening a
gift section in their carpet store. They can
be used to merchandise a range of products in a
wide variety of retail outlets.
|
 |
 |
Client: Just Williams
Toys |
Location: London |
|
|
Fitting time: 1 Week |
Another of our shopfits this month was in
Balham Hill for Just Williams Toys. The store had
custom painted slatwall panels and toy display
units to give it a bright and colourful
appearance. We also installed new flooring and a
bespoke counter modules.
|
 |
 |
Client: HRP - Orient Way |
Location: London |
|
|
Fitting time: 1 Week |
In March we finished our second shopfit for HRP,
the air conditioning trade store. This trade
counter is located near to the Olympic site in
Orient Way. The complete install included over 30
sheets of brushed aluminium slatwall, Tegomettal
shelving runs, new trade counter, ceiling,
electrics and flooring. We also supplied all the
signage for the interior and exterior of the
store.
|
 |
 |
Client: Beadworks |
Location: London |
|
|
Fitting time: 1 Day |
During February, we undertook a one day slatwall
install at Beadworks in Covent Garden, London.
Twelve sheets of beech slatwall with aluminium
inserts were installed by our 3 man team, they
were installed on various walls and pillars around
the store and finished of with matching trim. The
shop owners were so pleased with the end result we
recieved the following comments:
"My colleauges and i would like to thank
you for you and your teams hard work and a
fantastic job completed. I will definitely be
using your company and services next time i plan
another project. Our customers and my other
colleauges have praised and complemented the new
look of the shop".
|
 |
 |
Client: RSPCA - Newmarket |
Location: Newmarket |
|
|
Fitting time: 2 Weeks |
Our second shopfit for RSPCA has just been
completed, this time in the town of Newmarket. The
full fit included 27 sheets of white slatwall and
sprur uprights fitted around the shop walls, a new
wood/glass counter, window display, signage
and a wood flooring. We also decorated the shop
and installed new electrics.
|
 |
 |
Client: RSPCA - Market
Deeping |
Location: Lincolnshire |
|
|
Fitting time: 2 Weeks |
As a busy year comes to an end we have completed
our first shopfit for the RSPCA, located in the
small town of Market Deeping. The install included
30 sheets of white slatwall fixed with Tegometall
spur uprights, wood shelves, accessory arms,
poster frames, a new counter, new kitchen area,
flooring and the external shop signage.
|
 |
 |
Client: Advance
Performance |
Location: Peterborough |
|
|
Fitting time: 2 1/2
Weeks |
Moving into November saw us complete a shopfit
for a local sports retailer Advance Performance.
This time we had to install into a warehouse unit
which required the erection of a stud walling
system first. We then installed over 100 sheets of
maple and ivory slatwall, 5 internal doors, a new
suspended ceiling and changing room cubicles.
|
 |
 |
Client: Totally Games |
Location: Owestry |
|
|
Fitting time: 1 Week |
The second of the two shopfits for Totally Games
took place in Owestry, Shropshire. The existing
slatwall was retained and we installed over 150
shelves, 13 custom lightboxes, a counter unit and
various Tegometall shelving bays.
|
 |
 |
Client: Totally Games |
Location: Shrewsbury |
|
|
Fitting time: 1 Week |
Totally Games had 2 shopfits during October, the
first in Shrewsbury town centre. Our team of
installers took a week to install over 40 sheets
of slatwall, 160 browsing shelves, 20 glass
shelves, acrylic leaflet holders, custom made
lightboxes and gondolas. We also incorporated a
glass enclosure with lockable door.
|
 |
 |
Client: Unique Ladies |
Location: Kent |
|
|
Fitting time: 1/2 Day |
During October we completed a half day install at
a new clothes shop for Unique Ladies in
Chislehurst, Kent. We fitted a new ivory / oak
counter and several sheets of ivory slatwall to
the walls.
|
 |
 |
Client: Frosts Garden
Centre - Xmas |
Location: Brampton |
|
|
Fitting time: 1 Day |
Frosts Garden Centre in Brampton are already
thinking towards the Xmas sales period, and we
have just finished installing thier display walls
for the Xmas section of the store. We supplied and
fitted modular slatwall bulkheads, slatted column
displays and sets of glass and wood shelving.
|
 |
 |
Client: Norwich City FC -
Castle Mall |
Location: Norwich |
|
|
Fitting time: 1 Week |
Following on from the successful shopfit of the
Norwich City FC club store in August, we have now
completed the re-fit of their shop in the Castle
Mall Shopping Centre. We installed circa 30 sheets
of slatwall, both on the walls and on freestanding
display panels, a bespoke window display plinth,
shirt display shelves and a printing counter. We
also gave the external shopfront a new decoration
in club colours.
|
 |
 |
Client: Savin Wholesalers |
Location: Sandy |
|
|
Fitting time: 2 Days |
Savin Wholesalers in Sandy approached us to refit
the under stairs area in the retail section of
their garden centre. The install was spead over 2
days and included 22 wall bays locked together to
create a new display wall, glass and wood shelving
to display the merchandise, 4 doule sided gondolas
and sets of display tables.
|
 |
 |
Client: MIP - Rose Morris |
Location: London |
|
|
Fitting time: 2 Days |
Our last shopfit during August was a slatwall
installation at Music in Prints Rose Morris store
in Denmark Street London. We installed 25 panels
of maple slatwall with aluminium inserts around
the walls of the store and finished it off with
matching trim. We began the install out of hours
to minimise disruption to trading, and completed
in just 2 days.
|
 |
 |
Client: Folkstone Academy |
Location: Folkestone |
|
|
Fitting time: 3 Days |
August saw us complete an install at the
Folkestone Academy in Kent. The school shop had a
new tiered counter, slatwall, hinged cupboard
units, a "H" Gondola and various slatwall fittings
to enable the display of clothing and school
items. The install took just 3 days to complete
from start to finish.
|
 |
 |
Client: Norwich City FC
Store |
Location: Norwich |
|
|
Fitting time: 1 Week |
The last shopfit of the month saw us fit out the
club shop at Norwich City FC in Carrow Road,
ready for the first matchday of the new season.
The install consisted of 30 sheets of slatwall, 9
bespoke "H" Gondolas, a window display and new
charcoal carpet across the whole of the store. The
shop opened in time for the new season, and we are
now working on plans to refit the Castle Mall
store in the city shopping centre.
|
 |
 |
Client: Urban Den |
Location: London |
|
|
Fitting time: 1 Week |
In July we undertook a full shopfit for Urban Den
in Hampstead, London. The process involved the
removal of existing fitting and fixtures,
redecorating, and the installation of numerous
gift display units.
|
 |
 |
Client: Classical Trading |
Location: Kent |
|
|
Fitting time: 1 Day |
July began with an exhibition stand design and
build for Classical Trading (Glassware) Ltd. The
4m x 8m x 4m stand layout consisted of 22 "C" Wall
sections and a centre display with printed logo
panels. If you require an exhibition stand from
design through to installation please contact our
sales team on 01487 812822
|
 |
 |
Client: Childrens Trust -
Sevenoaks |
Location: Sevenoaks |
|
|
Fitting time: 1 Week |
In May The Children's Trust approached
us and asked to refit their charity shop in
Sevenoaks. After an initial site visit to measure
up and listen to their ideas a formal CAD drawing
and quotation was drawn up. Once approved we began
the week long refit at the end of June. The
project consisted of work on 2 floors, installing
a new ceiling grid, new timber effect flooring,
slatwall, skirting, window displays and a new
counter.
|
 |
 |
Client: Cambridge Piano
Forte |
Location: Cambridge |
|
|
Fitting time: 1 Day |
We recently supplied Cambridge Piano Forte with
over 20 custom made slatwall shelves designed to
display music books. We also produced 7
tiered book browsers, table tops and 16 sheets of
slatwall.
|
 |
 |
Client: Daniels - Hosiery
Displays |
Location: Windsor |
|
|
Fitting time: 4 Days |
We have just finished the manufacture and
installation of over 20 bespoke hosiery units for
Daniels store in Windsor. A combination of units
included pullout drawers, slatwall backs and
gondolas. We also supplied and installed over 40
floating shelves and 12 white cupboard units.
|
 |
 |
Client: HRP Air
Conditioning |
Location: Walthamstow |
|
|
Fitting time: 2 Days |
We have just completed the refit of HRP's trade
centre in Walthamstow London. The refit was
completed over 2 days and included the
installation of aluminium slatwall panels with red
trim, tegometall bays and gondolas and a new
counter module all finished in corporate colours
and logos. We also designed and installed a
catalouge display bench, repositioned existing
lighting and created a new doorway to the office
area.
|
 |
 |
Client: Little Yorkshire
Gift Company |
Location: Bingley |
|
|
Fitting time: 1 Day |
The Little Yorkshire Gift Company based in
Bingley have just taken delivery of 17 of our new
gift display units. We installed these into thier
new premises along with a new counter and several
other shelving displays. All the units had
downlighting and a combination of shelving,
cupboards and pigeon holes.
|
 |
 |
Client: Musicroom Bristol |
Location: Bristol |
|
|
Fitting time: 2 Weeks |
The last 2 weeks of March were spent
undertaking another new shopfit for
Musicroom, this time in Bristol. Amongst the items
installed were , slatwall, a sales counter, book
browsers, sheet music displays, a glass wall and
glazed showcases. A large portion of the job
entailed decorating the grade 2 listed building.
|
 |
 |
Client: Loco Espresso |
Location: Ely |
|
|
Fitting time: 2 Days |
Our first installation of this year took place on
a cold and snowy weekend of the 9th and 10th of
January. The coffee shop located on the Ely
train station platform had a new counter, several
tegometall gondolas, a new raised suspended
ceiling and 14 metres of wenge wall panelling
fitted.
|
 |
 |
Client: Lamorbey Wine |
Location: Sidcup |
|
|
Fitting time: 1 Day |
Our final shopfit of a very busy yearwas at a
wine retailer in Sidcup, Kent. We designed built
and installed 25 custom sized wine displays and a
curved retail counter with lockable drawers. We
also suppled 2 bottle chiller cabinets , all the
printed headers and installed 3 panels of oak
slatwall. The wine racks all have mini halogen
lights fitted to the top to illuminate the wine
bottles on display. The install was completed in a
day and opened in time for Christmas and end of
year sales.
|
 |
 |
Client: Barbican Library
|
Location: London |
|
|
Fitting time: 2 Days |
One of our most visually impressive library
installations has been completed at the Barbican
Centre Library in the heart of London. The job
entailed the manufacture and install of angled
freestanding panels, wall mounted slatwall, a
specialist LED lighting system, notice boards
with leaflet holders, over 50 shelves, and 18
music browsers. Before the install we removed and
disposed of all the existing units. The library
image has been transformed completely and has
given it an exciting and fresh new look.
|
 |
 |
Client: Early Music Shop |
Location: London |
|
|
Fitting time: 1 Week |
Another shopfit took place this month, this time
at the new Early Music Shop in Denmark Street
London. Having outgrown their former premises as
the London Recorder Centre they have taken up
residence in the heart of Londons cultural music
hub. We manufactured and installed new
book displays, recorder displays and sheet music
stands.
|
 |
 |
Client: Frosts Brampton |
Location: Brampton |
|
|
Fitting time: 1 Day |
One of our local projects in November was to
build a false wall using slatwall at Frosts Garden
Centre in Brampton. The wall consisted of 13 maple
slatwall panels with aluminium inserts, edging
trim and Tegometal wall uprights. The build took
just under a day and gave the garden centre a new
area to use as a clothing display wall.
|
 |
 |
Client: Musicroom
Portsmouth |
Location: Portsmouth |
|
|
Fitting time: 2 Weeks |
We have just completed a 2 week shopfit of
Musicrooms 17th store to open in the
UK. The sheet music and instrument
shop is located on Commercial Road in
Portsmouth. The job entailed hanging over 70
sheets of maple and red slatwall, installing new
carpet tiles, a logo printed entrance mat,
toughened glass walls and new electrics and
lighting. At International Displays we manufacture
all our own browsers, counters and
merchandise display stands. For this shopfit we
produced and installed drum stick displays,
recorder displays, sheet music browsers, glass
showcases, and guitar displays. We hope the new
store is a sucess for musicroom as they continue
to expand across the UK.
|
 |
 |
Client: Scorpion Shoes |
Location: Camden Town |
|
|
Fitting time: 1 Day /
Night |
The proprietor of Scorpion Shoes, a high profile
3 storey shoe store in Camden Town approched us to
provide a refit of their basement floor. The area
required a complete facelift to bring it into line
with the existing modern look and feel of the rest
of the store. We cladded the walls in high
gloss black laminated panelling and mounted
the striking backlit white shoe display panels
infront. All the units had illuminated headers at
the top and safety backed mirror panels
mounted in the bottom. We also supplied all the
specially made pegs and ferrules to enable the
display of the individual shoes.
|
 |
 |
Client: Gwynned Libraries |
Location: Gwynned |
|
|
Fitting time: 1 Day |
Gwynned Libraries have just launced a
mobile information service for young people which
will be visiting secondary schools in Gwynedd. The
mobile Library Service will also be used it to
visit primary schools to exchange books. This
project involved the supply and install of
red slatwall panels to hold various
leaflets, and tables to hold two laptops so
that youngsters can come into the van, collect
information leaflets and access the website. All
the panels were installed into their existing
mobile van, which also included the individually
printed header cards and graphics.
|
 |
 |
Client: Cash Generator
Preston |
Location: Preston |
|
|
Fitting time: 2 Weeks |
Our 6th Cash Generator Shopfit has just been
completed this time in Preston. The full
installation from start to finish took 2 weeks.
|
 |
 |
Client: Cash Generator
Ellesmere Port |
Location: Ellesmere Port |
|
|
Fitting time: 2 Weeks |
We have recently completed a 2 week shopfit of
the latest Cash Generator franchise to open, this
time in Ellesmere Port. All standard Cash Gen
components were fitted all into the bare shell,
completely renovating a derelict shop to a brand
new and fully functioning retail store. As this
project was underway, we were preparing to
undertake another shopfit in Preston.
|
 |
 |
Client: Bassaleg Post
Office |
Location: Newport |
|
|
Fitting time: 3 Days |
The proprietors of Bassaleg Post Office located
near Newport, South Wales approached
International Displays and asked us to undertake a
refit of their local town Post Office.
The re-fit encorporated the installation
of over 20 maple slatwall panels, Tegometall
bays, greeting card racks, acrylic shelving and
shopfitting accessories. We also supplied a custom
counter and a new shop door with
security push button access. The installation
took our team just 3 days to complete.
|
 |
 |
Client: Music Room |
Location: Stratford |
|
|
Fitting time: 1 Week |
One of our largest and most
established customers Music In
Print approached us to completely refit their
sheet music store in Stratford Upon Avon. The
re-fit which was completed mid August started by
stripping out all the existing fixtures and
fittings back to a basic shell. All new lighting,
flooring, ceiling, electrics, and slatwall was
installed in just 1 week. New book browers and
sheet music browsers were also put into place.
|
 |
 |
Client: Cash Generator
Partick |
Location: Partick |
|
|
Fitting time: 2 Weeks |
Our most recent Cash Generator shopfit has been
completed, this time it was in Partick, Scotland.
The 2 week install was completed on time and all
the Cash Generator components feature as
standard. Electrics, flooring, and ceiling
were all part of the install, including reworking
of existing space to maximise the retail area.
Checking and buying counters are always present in
Cash Generator stores and are complimented buy the
jewellery cabinets and window displays all in
corporate colours.
|
 |
 |
Client: Country Collage |
Location: Richmond |
|
|
Fitting time: 2 Days |
Country Collage is a small jewellery and gift
shop located in Richmond Surrey. During the first
week in July we undertook the refit of the store
which included the installation of white slatwall,
glass shelving, a new retail counter and a bespoke
jewellery display. We also decorated the shopfront
inside and out to give it a brand new look.
|
 |
 |
Client: St.Marys Girls
School |
Location: Ascot |
|
|
Fitting time: 3 Days |
Towards the end of June we undertook a project to
renovate an old laundry room at St.Marys girls
school in Ascot and transform it into the school
shop. The install consisted of a complete strip
out and the installation of 20 maple slatwall
panels, 4 glass display counters, Tegometal
shelving with cupboards and a
bespoke changing cubicle. The 3 day install
was completed on time and the grand opening of the
new school shop was undertaken to the delight of
all the students.
|
 |
 |
Client: Charity Shops |
Location: London |
|
|
Fitting time: 2 Days |
Since the successful airing of the BBC2
television series 'Mary Queen of Charity Shops' we
have been approached by several charity
organisations and stores to help improve their
image. From suppling simple bookcases and gondola
units to complete shopfits encorporating slatwall
and shelving, we have been able to makeover
numerous high street stores and they have already
reported an increase in turnover after only one
weeks trading. We have worked with many names
including The British Heart Foundation, Oxfam, The
Shakespeare Hospice and Help the Aged. If you have
a set budget and are looking for shop refit or
image makeover then we are the right shopfitting
company to help you. Contact us on 01487 812822
and speak to our sales team who can arrange an
appointment to come out and visit your premises
and discuss all the options available.
|
 |
 |
Client: DAB
International |
Location: Kent |
|
|
Fitting time: 1 Day |
This years European Open Golf Tournament was held
at the London Golf Club in Kent. We supplied,
delivered and installed a hire stand consisting
of 23 maple Freestanding Slatwall Units,
3 Counters, 2 H-Gondolas, several MDF
merchandising tables, and various slatwall
accessories. The official event merchandisers
approched us and asked us to design and supply a
stand to fit within their merchandising tents open
to the public over the duration of the tournament.
Setup of the stand commenced one week prior
to the event and was completed in just one day,
and breakdown and removal was completed in just 5
hours the day after the tournament finished. We
are able to take care of all your hire stand
requirements including design, supply and
installation, if you have a show or event coming
up soon then please contact us with your
requirements.
|
 |
 |
Client: Cash Generator
Cheetham |
Location: Cheetham Hill |
|
|
Fitting time: 2 Weeks |
Cheetham Hill in Manchester is the location of
the latest Cash Generator franchise that has
opened. The 2 week shopfit included all the usual
components including laminated cash desks,
security doors, glass display cabinets, slatwall,
browsing shelves, and all carpets, electrics and
ceiling. An added feature of this store is the
mezzanine floor that we had to install that will
be used as a stock room.
|
 |
 |
Client: Cash Generator
Neath |
Location: Neath |
|
|
Fitting time: 2 Weeks |
Another shopfit for the Cash Generator
franchise, this time in Neath, South Wales, has
just been completed. During the 2 week install,
all the usual components such as counters,
slatwall, Tegometall shelving bays, gondolas and
sliding glass door enclosures were installed. All
flooring and electrics were also dealt with
including aerial, CATV, CCTV and full test
equipment bays.
|
 |
 |
Client: Sheltons |
Location: Peterborough |
|
|
Fitting time: 2 Weeks |
The
final shopfit of a very busy month for us was a
local one at Sheltons of Peterborough Ltd - one
of the largest fishing tackle retailers in the UK.
Over 100 panels of maple slatwall were installed
into thier 3000 sq. ft store, along with Tegometall
Gondolas and wall runs. Special slatted lockable
window displays were also created to allow the
merchandise of product in the windows with easy
access. The stairwell was also slatted along with 10
internal doors to provide maximum display space to
the store which is planning a grand opening ceremony
in March. |
 |
 |
Client: Dents Photo |
Location: Chesterfield |
|
|
Fitting time: 1 Week |
Continuing
into February we completed another shopfit, this
time for "Dents Photo" in Chesterfield. This project
had a works duration of 1 week in which the store
was completely gutted and refitted to spec. This
included the fitting of new electrics, air
conditioning units, a completely new staircase, new
doors and also a new suspended ceiling. We also
layed new carpet tiles, vinyl and lino throughout
the store. The display components consisted of
Tegometall gondolas and wall bays, glass display
units, slatwall, and custom made storage counters.
We also manufactured and supplied the main
counter which included a gate flap for access.
Additional to the shopfit we supplied all the
display accessories and glass shelving. Alongside
all our own work we also project managed all the
contractors supplied by the client for the alarm,
phone and plumbing requirements. |
 |
 |
Client: The Green Bottle |
Location: Bucks |
|
|
Fitting time: 3 Days |
An
extremely busy February included the shopfit of
a new wine shop "The Green Bottle". This wine shop
is located in the small village of Chalfont
St.Giles, and was completed over a 3 day
period. The fit out included 30 bespoke made
wine display units, several slatwall panels
installing and a custom shaped laminated counter
with built in cupboards. We also installed a new
glazed front door and supplied all the header cards
and graphics for the inside of the store. |
 |
 |
Client: Cash Generator
Northampton |
Location: Northampton |
|
|
Fitting time: 1 week |
The
Cash Generator franchise is well known all over the
UK and our first full shopfit was undertaken at the
Northampton store in mid February. The distinctive
yellow and blue corporate colour scheme is a
hallmark of their "pawn broker" shops and this was
achieved by using coloured slatwall and powder
coated metal work. The whole shopfit took 2 weeks to
complete, and included custom lockable glass
cabinets, all doors with electronic entrance
keypads, sliding glass for the customer
counter areas and all flooring and lighting. We
are now working on numerous other franchises
over the UK with several more shopfits due to take
place soon. |
 |
 |
Client: Burwell Post
Office |
Location: Newmarket |
|
|
Fitting time: 2 days |
The
small village post office was completely stripped
out and maple slatwall installed to all walls.
Several Tego bays and gondola units were also
supplied along with shelving and acrylic card units.
3 Greeting card and gift wrap units were fitted to
replace the existing aging displays and provide the
shop with a new clean look. The install was
completed in just 2 days to ensure minimal
disruption to business. |
 |
 |
Client: Pounds Around |
Location: Dudley |
|
|
Fitting time: 3 days |
A
very busy November ended with a new shopfit for pawn
shop Pounds a Round in Dudley. The striking yellow
colour scheme is very eye catching and compliments
the type of items on sale. Over 20 panels of
slatwall with matching edging trim was hung and
various slatwall metal shelving supplied in the same
yellow colour. We also installed Tegometall, window
glass shelving and three bespoke counters. The job
took three men just three days to complete
which also included the laying of a new flooring
carpet tiles. |
 |
 |
Client: Mailboxes
Etcetera |
Location: Mill Hill |
|
|
Fitting time: 2 days |
Within
14 days of first contact with us the shopfit for
Mailboxes Etc has been fully completed. From the
initial site visit and quick quote turnaround our
team of four men took just two days to totally refit
the premises. 38 panels of slatwall have been
installed along with Tegometall uprights and several
island gondola units. The job also consisted of
installing extra spot lights into the window,
adjusting the existing counter, removing the low
level studwall and remounting existing cupboards in
the back area of the store. The owner of the shop is
so pleased with his new store he has already
recommended us to head office. |
 |
 |
Client: Moulton College
Garden Centre |
Location: Northampton |
|
|
Fitting time: 2 days |
During
October we installed a set of Tegometall bays with
slatwall back panels into the newly built
Moulton College Garden and Pet Centre. We also
designed and built several island counter units to
compliment the stores image and supplied many
different sizes of slatwall glass shelving. Due to
the nature of the wooden building nothing could be
screwed to the walls, this is where Tegometall comes
into its own as it is used freestanding but
still keeps the versatility of slatwall. |
 |
 |
Client: Cash Convertors |
Location: Grays |
|
|
Fitting time: 3 days |
The
Cash Convertors in Grays, Essex, refit consisted of
ripping out the contents of the existing shop before
installing slatwall, Tegometall and several glazed
showcase units. The 3 day shopfit also included the
manufacture and install of a new counter unit and a
laying a new floor. |
 |
 |
Client: Assembly of God |
Location: London |
|
|
Fitting time: 2 days |
During
a busy month we fitted out a new Christian
bookshop in London. The complete fit-out
consisted of installing maple slatwall panels
throught the store and supplying a combination of
both glass and wooden cabinets. The shopfit took 2
days to complete and transformed a bare carcass of a
room into a fully fitted retail bookstore. |
 |
 |
Client: Banks of York |
Location: York |
|
|
Fitting time: 4 weeks |
Our
most expansive project to date was undertaken at
Banks of York, the countries largest sheet music and
instrument store. The 3 floor shopfit took
around 4 months of planning and CAD to
ensure the desired result was achieved at
miniumum disruption to the store which needed to
keep trading during the install. Over 4500 sq ft
across the 3 floors was completely renovated
including flooring, ceiling, electrics, stairwells
and rails. |
 |
 |
Client: Movie Mix |
Location: Ilfracombe |
|
|
Fitting time: 1 week |
The
beginning of July saw us complete another week long
shop fit, this time it was a DVD and movie store
based in Ilfracombe North Devon. International
Displays completely gutted the existing store
and laid new flooring, installed a new ceiling and
re wired the electrics. The main transformation was
acheived by installing slatwall around the whole of
the store in an eyecatching white and red colour
scheme. |
 |
 |
Client: The Smiling Grape |
Location: St. Neots |
|
|
Fitting time: 2 weeks |
A
new local company, The Smiling Grape Company, opened
their first retail wine shop in St.Neots,
Cambridgeshire.
International Displays won the contract to refit the
grade 2 listed building from top to bottom including
a full re wire, new floor, external and internal
signage and a range of bespoke oak units finished
off with a 1800mm square wall mural of a vineyard in
Spain. The job was completed over a 2 week period. |
 |
 |
Client: Music Room |
Location: Norwich |
|
|
Fitting time: 2 days |
New
slatwall and several vinyl, and sheet music browsers
were installed in the Music Room in a 48 hour
shopfit. 2 teams of men worked non stop to ensure
minimum downtime to the music retailers business.
This is one of many stores we have re-fitted for the
Music Room around the UK. The colour scheme on this
shopfit centered around maple and aluminium and the
browsers were fitted to enable maximum display of
music books and ability to display items through the
window. |
 |
 |
Client: Atlantis Caps |
Location: London |
|
|
Fitting time: 8 hours |
One
of our smaller refits brought a fair few challenges.
A 3 metre x 2 metre mezzanine floor on Oxford
Street London was slatwall clad and bespoke
cupboards and mirrors were added to give a stylish
finish to a baseball cap concession. The shop was
finished in 8 hours despite massive parking and
access restrictions. |
 |
 |
Client: Nite Out |
Location: Aberdeen |
|
|
Fitting time: 4 days |
Successful
adult chain Nightlife recently opened their first
party accessories store in Aberdeen. The Nite Out
shop was a 4 day fit out by The Shop Fitter which
included the laying of a new oak laminate floor,
electrical and plumbing work, external signage and
all internal fixtures and fittings. The job also
entailed installing 25 sheets of slatwall with
aluminium inserts and a new counter matching the
shops colour scheme. |
 |
 |
Client: Jaysons |
Location: Birmingham |
|
|
Fitting time: 5 days |
In
March, Jaysons store in Birmingham knocked through
into a back room and doubled the size of his retail
space. The Shop Fitter won the contract to refit the
newly sized store using 62 sheets of white
slatwall with inserts. We also installed Tegometall
bays, 11 bespoke glass cabinets, over 100 multimedia
shelves and a 14 metre glass and aluminium
counter. The fit was completed over 5 days and the
store re-opened within 2 weeks. |
 |
 |
Client: Hawleys |
Location: Dartford |
|
|
Fitting time: 4 days |
We
completed the refit and refurbishment of three
sections of the Hawley Garden Centre in Dartford.
The project consisted of renovating the gift,
stationary and store room sections
by installing slatwall to all areas. This was a
particularly complicated job due to the nature of
the glass buildings used in garden centres, so a lot
of stud work had to be carried out prior to the
installation of the slatwall. |
 |
 |
Client: Frosts |
Location: Frilford |
|
|
Fitting time: 2 days |
The beginning of this month saw another Frost's
Garden Centre shop fit completed, this time it was
their Millets Farm outlet. The 2800 sq ft
installation consisted of 41 slatwall and
tegometall gondola's, as well as over 40 slatwall
and windows units. The installation was completed
in just 2 days, thus minimizing disruption to
their existing trade.
|
 |
 |
Client: PMS International |
Location: Basildon |
|
|
Fitting time: 15 days |
This month we undertook one of our largest
projects to date with the fitting of the new
showroom at PMS International. The 12,500 sq ft
showroom had over 700 panels of slatwall fitted
and a huge range of gondola units manufactured and
installed.
|
 |
 |
Client: Music Room |
Location: Salisbury |
|
|
Fitting time: 10 days |
May was another busy month for The Shop
Fitter with several shopfittings taking place. The
Music Room in Salisbury had a complete re-fit and
we undertook the whole project from start to
finish which included designing and installing the
custom built displays, furniture and browsers as
well as all the lighting and counters.
|
|
|
|
TheShopFitter 01487 812822 supply
Shop Counters, Shop Refits, Slatwall Solutions, Shopfitting, CAD
Design, Retail Display Solutions, Bespoke Joinery Solutions,
Flooring Services, Slatwall and Tegometall Shelving, Turnkey Shop
Fitting Solutions, Plumbing, Electrical Work, Air Conditioning,
Ceilings, Security Systems, Flooring, Lighting. Shopfitters for
Music Shops, Charity Shops, Toy Shops, Retail Showrooms, Adult
Shops, Pawn Brokers, Garden Centres, Corner Shops, Village Stores,
Book Shops, Libraries, Art Galleries, Post Offices, Mobile Shops
& Libraries, Sports Shops, Shoe Shops, Games Shops,
Wholesalers, Club Shops, Wine Shops, Off Licenses, School Shops,
Trade Counters, Gift Shops, Fishing Shops, Tackle Shops, Gun
Shops.
|
|